From an engineering plan to a rebar order ready in minutes
The system for site engineers
Calcon detects the rebar in the plan, flags problems and prepares the list. The engineer verifies instead of typing — and focuses on what matters.
Book a demoWorks directly on PDF files, for every type of plan:
This is an illustration. We’ll show you the system itself in a demo meeting.
Book a demoWhat we see in the field
5–10%
Average error we found in manual rebar orders during the pilots
What we found in the field
- Rebar orders that go out to the site with errors
- Revit schedules that don’t match the plan
- Manual quantity takeoffs with errors
Get to know the system
How it works
Upload a PDF of the plan; the system detects the rebar, calculates quantities and produces a rebar list ready to order.
Review and approval
The system flags contradictions and missing information in advance, and the engineer approves. Only approved rows go into the order.
For management
An organization-wide dashboard: steel weight, orders and quantities by project, user and time.
About 5 hours
Saved per engineer, every week
Less waste
An order matched exactly to the plan and the site’s needs
Building the frame efficiently: accurate orders, engineers who focus on quality work, and a project that moves forward on schedule.
Accurate, fast rebar and concrete quantity takeoff
Calcon’s team of quantity surveyors analyzes your structural plans — with documents that prove every number.
Quantity takeoff service – structural frame
Visit the quantity takeoff service websiteBook an intro meeting and demo
We’d be glad to present the system and show how it fits into your work.
Phone
+972-52-374-7108